Structural and soft-strip demolition for projects of every scale, planned and executed by teams who've worked London's toughest sites since 1964.

777
DEMOLITION
Overview

Demolition that starts with the plan, not the machine.

The demolition industry has changed substantially over the last few decades — tighter regulation, more complex urban sites, and far greater scrutiny on safety and environmental impact. Our demolition teams have grown with those changes rather than around them.

We work on traditionally-procured and negotiated contracts alike, with resource able to scale from single-structure soft-strip through to complex, phased demolition on live sites.

777 Group demolition site
Site works — 777 Demolition
Capability

What We Handle

Structural Demolition

Full building demolition using mechanical, high-reach and controlled methods matched to site constraints.

Soft Strip

Internal strip-out ahead of refurbishment or full demolition, with materials segregated for recycling from day one.

Temporary Works

Shoring, propping and structural support engineered to keep adjacent structures and the public safe throughout.

Enabling Works

Site clearance, utility disconnection and groundworks preparation ahead of the main contractor's programme.

Selected Work

Recent Projects

Crystal Palace National Sports Centre
Leisure

Crystal Palace National Sports Centre

Emergency structural dismantling works following the closure of Crystal Palace National Sports Centre due to severe structural deterioration. 777 Demolition carried out high-stakes works at height to dismantle dangerous concrete floodlight towers, removing an immediate collapse risk to the surrounding facilities and clearing the way for the site's subsequent improvement works.

December 2022
10 Brindleyplace, Birmingham
Commercial

10 Brindleyplace, Birmingham

Specialist structural strip-out and alteration works at 10 Brindleyplace, working alongside principal contractor Willmott Dixon Interiors. The largest element of the works was full removal of the building's facades, a combination of curtain walling and brickwork, along with all 8 lifts spanning up to 14 floors. The team carried out diamond sawing works to form new atriums, demolished the frame of a further atrium, and removed all plant structures and mechanical and electrical plant, clearing the building back to its structural concrete frame ahead of the site's redevelopment into a single combined workspace.

Willmott Dixon Interiors · 2021
View All Case Studies
Process

How a Project Runs

01

Survey & Planning

Site survey, structural assessment and method statement, developed alongside the client's design and programme team.

02

Consents & Notices

Section 80 notices, party wall coordination and utility disconnections handled ahead of mobilisation.

03

Site Mobilisation

Hoardings, welfare and site-specific safety briefings in place before plant arrives.

04

Demolition & Recovery

Phased demolition with material segregation for recycling running in parallel, not as an afterthought.

05

Handover

Site cleared, levelled and handed back to programme — with full documentation for the record.