777 Environmental sits at the front of one of the highest-risk areas of construction — asbestos removal and site remediation — with 30 years of managing it safely.
This is a high-risk area of the industry, and we treat it that way. Every project is managed to strict regulatory standards, with licensed operatives, full air monitoring, and documentation that stands up to scrutiny long after the work is done.
Pre-works survey identifies scope, risk classification, and the licensing required before anyone mobilises.
Negative-pressure enclosures, controlled access, and continuous air monitoring throughout the works.
Licensed removal and disposal at approved facilities, with full documentation retained for the client.
Independent clearance testing before any area is handed back for onward works.
Full demolition of the iconic Wimbledon stadium, including Japanese knotweed removal, notifiable asbestos removal, and demolition works carried out beside a live UKPN sub-station using protective scaffolding and fine water sprays for dust suppression.
Demolition and site enabling works as Principal Contractor on a sensitive site adjacent to Tate Modern and live office buildings, including sub-station protection and relocation, and demolition varying between top-down and high-reach methods.