Waste management has become far more than an industry requirement — it's a measurable part of every project's outcome. We process material on site to keep it out of landfill wherever possible.
We consolidate our position at the forefront of this critically important part of the industry by treating recycling as a core operation, not a subcontracted afterthought. Concrete, brick, timber, and metal are segregated and processed on site wherever practical.
Clients receive a reportable diversion rate for every project — useful for BREEAM, planning conditions, and internal ESG reporting.
Crushed and graded on site for reuse as sub-base or hardcore, reducing haulage and virgin material demand.
Ferrous and non-ferrous metals separated and sent for recycling, with recovery values offset against project cost.
Segregated for reuse, chipping, or biomass, kept out of general waste streams.
Remaining construction and demolition waste sorted at licensed facilities to maximise diversion from landfill.
“Every tonne processed on site is a tonne that doesn't need haulage, doesn't need landfill tax, and doesn't sit on someone else's balance sheet as waste.”
777 Recycling — Operations
Business de-rating works across an 18-acre-plus site as Principal Contractor, including licensed high-risk asbestos removal, cavity wall contamination, ammonia pipework removal, and works carried out around a live sub-station.
Demolition and site enabling works as Principal Contractor on a sensitive site adjacent to Tate Modern and live office buildings, including sub-station protection and relocation, and demolition varying between top-down and high-reach methods.